February 06, 2020 4698 Views

Description

BVB-substrates in De Lier, is part of Kekkilä-BVB and produces substrates (growing media) for plants in the professional and retail consumer market.

 

Opportunities

BVB-substrates needed to implement a new logistics concept in De Lier which improved the storage capacity and storage conditions to meet the seasonal peek and market demand. To allow for the growth a warehouse was designed and realized, which included a conveyor connection with the production area, multi layer storage, shuttle operated drive in racking, reach trucks and loading pit. At the same time a new WMS was implemented.

 

Solution

Due to the seasonal demands only a 4 month time window was available in which the warehouse was built, systems installed and racking erected. Activities executed were:

  • Provide the architectural and structural design
  • Manage the permit application
  • Manage tender process and contracting for Building, Logistics and WMS, including PoR- and contract documents.
  • Manage review detailed design drawings, construction, implementation and commissioning of building and (IT) systems.
  • Set-up and manage testing and support Go-Live.

 

Benefits

  • Improved storage capacity and storage conditions enabling a further growth of the production location in De Lier
  • Improved process control
  • Minimum impact on the operations
  • Project delivered in time and within budget