Bakkersland wanted to combine two existing warehouses for bake-off products into one new location in Tilburg.

Opportunities
Assignment Groenewout was to define the optimal storage and handling methods and to develop a lay-out for the new operation.
15,000 m2 building size (new location), existing building

  • 10,500 pallets to be stored
  • 450 SKU-batch combinations
  • 1,700 shipped pallets per day (peak)
  • Solution
    Data analysis of the current situation with two sites:

    • Seasonality of stock per week
    • Seasonality of shipped / received pallets per week
    • Mix between pallet types (Euro / Industry, stackable / non-stackable)
    • Evaluation of storage and handling methods:
      • Combination of drive in racks and conventional pallet racks was chosen
      • Special attention to sizing of shipping area

     Deliverables:

    • Lay-out drawing in AutoCad
    • Required number of FTE’s
    • Investment estimate
    • Program of Requirements for new racking, as a basis for the contract between Bakkersland and the supplier.

    Benefits

    • Groenewout helps the Bakkersland team in defining the optimal lay-out and working methods
    • The chosen solution is the result of a good cooperation and is supported by Bakkersland management, Bakkersland warehouse staff as well as Groenewout
    • Groenewout provided valuable input for discussions with the landlord (for example regarding the sprinkler system)
    • Short response times to meet the tight planning of Bakkersland.